Our scope of work for maintenance includes:

1. Fire Alarm System

2. Fire Extinguishers

3. Fire Hose Reel System

4. Fire Pumps

5. Sprinkle System

FIRE ALARM SYSTEM

Image
  1. Conditions of control panel i.e. no physical damage, indicators, intact, etc.
  2. Check-up batteries and charger operation with or without main supply.
  3. Checkup of control panel response to alarm condition audibly indications i.e. all bells active on receiving of fire alarm.
  4. Cleaning of associated devices necessary.
  5. Testing of 'Alarm receiving Devices' for visible and audible indications in compliance with required standards.

FIRE EXTINGUISHERS

Image
  1. Extinguishing medium and applied pressure.
  2. Medical functions of all components.
  3. Extinguishers are located in designed place.
  4. A sticker will be fitted to all extinguishers, hydrants indicating the inspection date, and provision.
  5. The extinguished location will be marked and fitted to all extinguishers.

HOSE REEL SYSTEM

Image
  1. Clean and check hose reel cabinets. Lubricate the hinges.
  2. Inspect the swing mechanism of each hose reel unit of lubricant where necessary.
  3. Run out hose, check for lubricate where necessary. Run out hose, check for damage or deterioration. Check nozzle mechanism.
  4. Condition of equipment, i.e. no physical damage or corrosion or leakage.
  5. Discharge water for pressure rating.
  6. Response to pump, i.e. when operated pump should start automatically.
  7. Inspection of valves, nozzles

SPRINKLER SYSTEM

Image
  1. Visual inspection of pump room pipe work, joint and fittings for leakage. Check corrosion and paint work.
  2. Exercise electric pump, check start sequence.   
  3. Exercise diesel pump, check start sequence and temperature (where fitted), engine speed (where fitted), shutdown mechanism. Check batteries and charger. Check fuel level.
  4. Annually change oil and filters, controllers' fuses, check pump alignment and coupling condition.
  5. Check pump motor set, mounting, bearing and leakage.
  6. Check pressure switch operation, setting, flow switches, pump run timers, system standing pressure and fall back.
  7. Check and exercise all valves.

FIRE PUMPS

Image
  1. Visual inspection of pump room pipe work, joint and fittings for leakage. Check corrosion and paint work.
  2. Exercise electric pump, check start sequence.   
  3. Exercise diesel pump, check start sequence and temperature (where fitted), engine speed (where fitted), shutdown mechanism. Check batteries and charger. Check fuel level.
  4. Annually change oil and filters, controllers' fuses, check pump alignment and coupling condition.
  5. Check pump motor set, mounting, bearing and leakage.
  6. Check pressure switch operation, setting, flow switches, pump run timers, system standing pressure and fall back.